How do build-out, utilisation, pricing, and operating assumptions shape project performance?
Model profile
Taxi_mini_Buses mobility financial model
A South African minibus taxi business on fixed routes, set up for Gauteng: six Toyota Quantum taxis on two local routes into Johannesburg and a long-distance route to Durban, at the fixed fares their taxi associations agreed. Create any route and fare, link it to its association, and plan as many round trips a day as the taxis can run. Association joining fees, annual membership, levies and rank fees, road tax, licences and insurance are expensed; the taxis are bought with instalment finance or leased; and one drop-down switches the fleet between fossil fuel and electric, each with its own costs. Tested on South African tax, cover and the cash left per taxi after the instalment.
Decision scope
Questions this model helps you examine
What capital, replacement, working capital, and financing programme is required?
How resilient are cash flows and returns under operational and market downside cases?
Model capabilities
What this model includes
The profile below is generated from the same catalogue and workspace definitions used by the application.
- Routes from a starting rank to a destination at the fixed fare the taxi association agreed, with unlimited round trips a day
- A check that the planned trips fit in the operating day, and, for electric taxis, in the battery's range
- Taxi associations with joining fees, annual membership, an annual levy per taxi and monthly rank and marshal levies
- A fossil fuel or electric fleet from one drop-down, each with its own vehicle, energy, maintenance, insurance and charging back end
- Taxis bought outright with SA Taxi-style instalment finance, or leased
- Drivers on a wage or commission, UIF and SDL, licence disc, roadworthy, route operating licences, tolls and downtime
- The Taxi Recapitalisation Programme scrapping allowance when an old taxi is replaced
- Small business corporation or company tax, assessed losses under the 80% rule, SARS wear-and-tear and deferred tax, fares exempt from VAT
- Opening sources and uses, with the association joining fees paid from the owner's equity
- Fare leakage: the share of fare takings that never reaches the owner
- Three statements, DSCR, project returns, equity returns on the owner's dividends and the exit value, route economics and the cash left per taxi after the instalment
- A fossil fuel versus electric comparison on the same routes
- An electric fleet with long-distance routes kept on diesel, a battery subscription, a 70% loan over 96 months that clears 1.20x cover without a grant, and an optional capital grant
- Named scenarios, goal seek, tornado, VaR/CVaR, correlated Monte Carlo and a fleet-expansion decision tree
Build the case
Inputs and workspaces
- AssumptionsProject timing, the fossil fuel or EV drop-down, purchase or lease, vehicle finance, drivers, licences, running costs, tax and valuation
- Fossil fuel taxisVehicle, price, lease, fuel use and price, maintenance, tyres and insurance for a diesel or petrol fleet
- Electric taxisVehicle, price, lease, battery, range, charging, chargers, battery replacement, maintenance and insurance for an electric fleet
- Taxi associationsJoining fees, annual membership, levies per taxi and rank and marshal levies
- Routes and faresStarting rank, destination, the association's fixed fare, taxis, round trips and loads per route
- FinancingOwner equity, other loans and other CAPEX
- AnalyticsNamed scenarios, goal seek, correlated Monte Carlo and the fleet-expansion decision tree
Review the result
Outputs and analysis
- Project NPVZAR, at WACC
- Project NPV without a terminal valueZAR, forecast years only
- Project IRRUnlevered, after tax; not shown for a leased fleet
- Equity IRRDividends plus the exit value
- Equity MOICDividends plus the exit value, on equity
- Equity MOIC from dividends onlyNo exit value
- Cash-on-cash yieldAverage dividends a year, on equity
- Opening funding surplusZAR, sources less uses
- 15 additional metrics in the workspace
- Financial statementsDetailed schedules
- Routes, taxis, financing & valuationDetailed schedules
- Risk & analyticsDetailed schedules
Designed for review
Who this model is for
- Infrastructure sponsors
- Operating and engineering teams
- Financial advisers
- Investors and lenders
Governed evidence
The review trail stays with the result.
Each completed calculation preserves the model version, saved inputs, reporting-currency snapshot, immutable run, and result fingerprint used for its reports.
- Version-controlled calculation logic
- Saved assumptions and scenarios
- Immutable calculation runs
- Reporting context preserved in exports
Ready to explore the case?