Model profile

Solar Green Hydrogen

A solar plant built to power an electrolyser, set up for South Africa's Northern Cape or for any country you choose: a 20 MW alkaline electrolyser on a 40 MW single-axis tracking solar plant near Upington, selling hydrogen to an industrial buyer under a 20-year contract and the solar power it cannot use under a wheeling agreement, with an optional battery and an optional grid top-up whose emissions are checked against the EU renewable threshold. A clone of Wind Green Hydrogen with the sun in place of the wind, so the two compare directly. Other cases: a PEM electrolyser, a battery, more sun, fixed tilt, no export, an off-peak grid top-up, an export ammonia price, no grant, and a concessional package.

Decision scope

Questions this model helps you examine

01

How do build-out, utilisation, pricing, and operating assumptions shape project performance?

02

What capital, replacement, working capital, and financing programme is required?

03

How resilient are cash flows and returns under operational and market downside cases?

Model capabilities

What this model includes

The profile below is generated from the same catalogue and workspace definitions used by the application.

Build the case

Inputs and workspaces

  • CasesLoad the base, PEM, battery, more sun, fixed tilt, no export, grid top-up, export price, no grant or concessional case
  • Project and solar plantCountry, timeline, electrolyser size, solar oversizing, tracking, DC/AC ratio, latitude, capacity factor, P90, export, inverters and the local currency
  • Electrolyser and salesTechnology, power use, minimum load, stacks, water, the hydrogen contract, surplus power, oxygen, the battery and the grid top-up
  • Capital and operating costsCapital costs per kW, development, contingency, operation and maintenance, insurance, water and levies
  • StaffPositions, headcount and monthly cost in local currency
  • FinancingLoan sizing on P50 and P90 cover, gearing, rate, tenor, reserves and the grant
  • TaxCorporate tax, capital allowances on the solar plant and the hydrogen plant, losses and holidays
  • Valuation and riskCost of capital, the hydrogen price deck and the Monte Carlo of eight risks
  • Due diligenceIrradiance measurement, offtake, licences, grid, environment, water, contracts, safety and certification

Review the result

Outputs and analysis

  • Project NPVUSD, at WACC
  • Project IRRUnlevered, after tax
  • Equity IRRAfter debt service
  • WACCDiscount rate
  • Levelised cost of hydrogenUSD/kg, at WACC
  • Levelised hydrogen priceUSD/kg, contract then merchant
  • Break-even hydrogen priceUSD/kg, first operating year
  • Price over break-evenContract price headroom
  • 30 additional metrics in the workspace
  • Financial statementsDetailed schedules
  • Lender view, energy, funding & valuationDetailed schedules
  • Risk & analyticsDetailed schedules

Designed for review

Who this model is for

Governed evidence

The review trail stays with the result.

Each completed calculation preserves the model version, saved inputs, reporting-currency snapshot, immutable run, and result fingerprint used for its reports.

Ready to explore the case?

Start with the governed base case, then adapt it to your project.

Start free with this model