NumQuants

Model profile

EV Two-Wheeler Manufacturing

A plant that assembles electric scooters, motorcycles and cargo three-wheelers from imported kits, with its own battery pack line, set up for a free-zone plant in Kenitra, Morocco, or for any country you choose: 30,000 units a year on one shift, ramping up over three years, selling to Moroccan dealers and fleets at prices set in dirhams, funded with a term loan, a revolving facility and the equity the model finds it needs. Other cases: finished packs bought in, a battery-swap subscription business, 30 per cent exported to Europe, a second shift, a slow ramp-up and kits taxed as finished vehicles. Tested the way a lender would: unit margins, working capital, the market share needed, the kits' duty and cover in a downside.

Decision scope

Questions this model helps you examine

01

How do capacity, production, pricing, and quality assumptions shape the manufacturing plan?

02

What working capital, capital programme, and financing structure does the business require?

03

How do demand, cost, and financing downside cases affect cash flow and investment returns?

Model capabilities

What this model includes

The profile below is generated from the same catalogue and workspace definitions used by the application.

Build the case

Inputs and workspaces

  • CasesLoad the base, bought-in packs, battery-swap, European export, second shift, slow ramp-up or full-duty case
  • Plant and marketCountry, timeline, capacity and shifts, the ramp-up, seasonality, stock, the market, exports and the local currency
  • Products and battery packsProduct mix, prices, kits, battery sizes, assembly hours, in-house or bought packs and cell prices
  • Costs and working capitalFreight, duty, supplier terms, wages, power, rent, overheads, plant and equipment, the grant and credit terms
  • StaffPositions, headcount and monthly cost in local currency
  • Battery swapSwitch the subscription business on, with its share of sales, fee, churn, batteries and stations
  • FinancingTerm loan, grace and tenor, revolving facility and borrowing base, minimum cash, dividends and the lender downside
  • TaxFree-zone or standard regime, holiday, threshold rate, minimum tax and losses
  • Valuation and riskCost of capital, terminal value and the correlated Monte Carlo
  • Due diligenceType approval, kit and cell supply, tariff ruling, zone lease, investment agreement, dealers, fleets, battery safety and export origin

Review the result

Outputs and analysis

  • Project NPVUSD, at WACC
  • Project IRRUnlevered, after tax
  • Equity IRRAfter debt service
  • Multiple on invested capitalDistributions over equity
  • WACCDiscount rate
  • Project NPV without a terminal valueUSD, forecast years only
  • Project NPV in local currencyAt the first-year exchange rate
  • Units soldSteady state, a year
  • 29 additional metrics in the workspace
  • Financial statementsDetailed schedules
  • Lender view, production, funding & valuationDetailed schedules
  • Risk & analyticsDetailed schedules

Designed for review

Who this model is for

Governed evidence

The review trail stays with the result.

Each completed calculation preserves the model version, saved inputs, reporting-currency snapshot, immutable run, and result fingerprint used for its reports.

Ready to explore the case?

Start with the governed base case, then adapt it to your project.

Start free with this model