NumQuants

Model profile

EV Passenger Car Manufacturing

A plant that welds, paints and assembles electric city cars, compact SUVs and light vans from imported kits and local parts, set up for a free-zone plant in Kenitra, Morocco, or for any country you choose: 30,000 cars a year on one shift, ramping up over three years, battery packs bought from a battery plant in Morocco, 85 per cent exported to Europe duty-free under the rule of origin and clear of the EU countervailing duty while Chinese parts stay under the anti-circumvention threshold, half the kit price linked to the car's price and half invoiced in euros, funded with a term loan sized on what the lender downside can repay, a revolving facility and the equity the model finds it needs. Exports are priced in euros under an importer's contract, the rule of origin is tested car by car each month, and the loan is sized on a downside that includes prices falling faster each year, with a development-finance tranche, a reserve and a cash sweep once repayments begin. Other cases: 20,000 cars a year, packs imported from China, packs assembled in-house, local packs from Chinese cells, a late local battery plant, the countervailing duty on every export, a price war, dollar kits with no price link, a plain bank loan, half the output sold in Morocco, a second shift, a slow ramp-up and a battery subscription. Tested the way a lender would: unit margins, working capital, the rule of origin, the anti-circumvention test, the market share needed and cover in a downside, one risk at a time.

Decision scope

Questions this model helps you examine

01

How do capacity, production, pricing, and quality assumptions shape the manufacturing plan?

02

What working capital, capital programme, and financing structure does the business require?

03

How do demand, cost, and financing downside cases affect cash flow and investment returns?

Model capabilities

What this model includes

The profile below is generated from the same catalogue and workspace definitions used by the application.

Build the case

Inputs and workspaces

  • CasesLoad the base, 20,000 cars, imported packs, in-house packs, Chinese cells, late battery plant, countervailing duty on every export, price war, dollar kits, plain bank loan, domestic focus, second shift, slow ramp-up or battery subscription case
  • Plant and marketCountry, timeline, capacity and shifts, the ramp-up, seasonality, stock, the market, exports and the local currency
  • Products and battery packsCar mix, prices, kits, local parts, battery sizes, production hours, where the packs come from and their prices
  • Costs and working capitalFreight, duty, supplier terms, wages, power, rent, overheads, body and paint shops, plant and equipment, the grant and credit terms
  • StaffPositions, headcount and monthly cost in local currency
  • Battery subscriptionSwitch the battery subscription on, with its share of sales, fee, churn, batteries and swap stations
  • FinancingLoan sizing on the downside, tranches, repayment shape, reserve, cash sweep, trade finance, grant bridge, revolving facility, dividends and the lender downside
  • TaxFree-zone or standard regime, holiday, threshold rate, minimum tax and losses
  • Valuation and riskCost of capital, terminal value and the correlated Monte Carlo
  • Due diligenceType approval, kit and pack supply, tariff ruling, zone lease, investment agreement, dealers, export offtake, battery safety, export origin, cell origin and the kit contract

Review the result

Outputs and analysis

  • Project NPVUSD, at WACC
  • Project IRRUnlevered, after tax
  • Equity IRRAfter debt service
  • Multiple on invested capitalDistributions over equity
  • WACCDiscount rate
  • Project NPV without a terminal valueUSD, forecast years only
  • Project NPV in local currencyAt the first-year exchange rate
  • Units soldSteady state, a year
  • 29 additional metrics in the workspace
  • Financial statementsDetailed schedules
  • Lender view, production, funding & valuationDetailed schedules
  • Risk & analyticsDetailed schedules

Designed for review

Who this model is for

Governed evidence

The review trail stays with the result.

Each completed calculation preserves the model version, saved inputs, reporting-currency snapshot, immutable run, and result fingerprint used for its reports.

Ready to explore the case?

Start with the governed base case, then adapt it to your project.

Start free with this model