NumQuants

Model profile

EV Heavy Duty Trucks Financial Model

A plant that welds and paints its own cabs and frames and assembles electric heavy trucks, set up for an industrial park in Shiyan, Hubei, China, or for any country you choose: 15,000 trucks a year on one shift, 6x4 tractor units, 8x4 dump trucks and 4x2 rigid cargo trucks built from parts and LFP battery packs bought from Chinese suppliers, ramping up over three years. Nine in ten are sold in China, four in ten of those under framework orders from logistics, mining and leasing fleets, and the rest exported, priced in dollars. Funded the way a lender would structure it: a term loan sized on the lender downside and shaped to the cash flow, a debt service reserve, a cash sweep, trade finance on imported components and a revolving facility, with the equity the plant needs found month by month. Other cases: high and new technology enterprise tax, battery swapping, packs assembled in-house, a pack price rebound, a price war, an export push, an anti-subsidy duty on exports, a plain bank loan, a 10,000-truck plant, a second shift, a new entrant at 75% and a slow ramp-up. Tested on a 15-year forecast with and without a terminal value, China's tax rules and cover in a downside.

Decision scope

Questions this model helps you examine

01

How do capacity, production, pricing, and quality assumptions shape the manufacturing plan?

02

What working capital, capital programme, and financing structure does the business require?

03

How do demand, cost, and financing downside cases affect cash flow and investment returns?

Model capabilities

What this model includes

The profile below is generated from the same catalogue and workspace definitions used by the application.

Build the case

Inputs and workspaces

  • CasesLoad the base, high-technology tax, battery swapping, in-house packs, pack price rebound, price war, export push, anti-subsidy duty, plain bank loan, 10,000-truck plant, second shift, new entrant or slow ramp-up case
  • Plant and marketCountry, timeline, capacity and shifts, the ramp-up, seasonality, stock, the market, fleet orders, exports and the local currency
  • Products and battery packsTruck mix, prices, imported components, local parts, battery sizes, production hours, where the packs come from and their prices
  • Costs and working capitalFreight, duty, supplier terms, wages, power, rent, overheads, cab, frame and paint shops, plant and equipment, the grant and credit terms
  • StaffPositions, headcount and monthly cost in local currency
  • Battery swappingSwitch battery swapping on, with its share of sales, fee, churn, batteries and swap stations
  • FinancingLoan sizing on the downside, tranches, repayment shape, reserve, cash sweep, trade finance, grant bridge, revolving facility, dividends and the lender downside
  • TaxStandard or incentive regime, the high and new technology rate, holiday, minimum tax and losses
  • Valuation and riskCost of capital, target gearing, terminal value and the correlated Monte Carlo
  • Due diligenceVehicle announcement and CCC, supply agreements, customs classification, land, investment agreement, dealers, fleet orders, battery safety and export origin

Review the result

Outputs and analysis

  • Project NPVUSD, at WACC
  • Project IRRUnlevered, after tax
  • Equity IRRAfter debt service
  • Equity IRR without the exit valueDividends only
  • Sponsors' hurdle rateReturn investors expect
  • Multiple on invested capitalDistributions over equity
  • Multiple, dividends onlyWithout the exit value
  • WACCDiscount rate
  • 37 additional metrics in the workspace
  • Financial statementsDetailed schedules
  • Lender view, production, funding & valuationDetailed schedules
  • Risk & analyticsDetailed schedules

Designed for review

Who this model is for

Governed evidence

The review trail stays with the result.

Each completed calculation preserves the model version, saved inputs, reporting-currency snapshot, immutable run, and result fingerprint used for its reports.

Ready to explore the case?

Start with the governed base case, then adapt it to your project.

Start free with this model