How do build-out, utilisation, pricing, and operating assumptions shape project performance?
Model profile
AI Data Centre / GPU Cloud Financial Model
A company that owns an AI data centre and its GPUs and sells their compute by the GPU-hour, set up for Johannesburg, South Africa, or for any country you choose: a 12 MW hall with 5,600 Blackwell-class GPUs kept six years, 70% of them on five-year take-or-pay contracts and the rest sold on demand at prices that fall as each generation ages, 2 MW leased to colocation tenants and most of the power wheeled from a renewable supplier, funded with a US dollar loan, GPU loans for each refresh and a vendor-financed black-owned partner. Built on the structure of the Cement Manufacturing Financial Model. Other cases: no contracts, an anchor customer, fast price declines, five-year generations, a leased hall, grid-only power, grid outages, a rand loan, a larger hall and a high-return case. Tested the way a lender would: revenue under contract, first-term contracts against the fleet's cost, the price decline, and debt sized on base and downside cover.
Decision scope
Questions this model helps you examine
What capital, replacement, working capital, and financing programme is required?
How resilient are cash flows and returns under operational and market downside cases?
Model capabilities
What this model includes
The profile below is generated from the same catalogue and workspace definitions used by the application.
- A data hall in MW of IT load with a PUE, built or leased, and a GPU fleet replaced each generation
- Take-or-pay contracts fixed for their term and re-signed at the market price, and on-demand sales at falling prices
- Platform services and colocation tenants paying rent and their power at cost plus a margin
- Grid, wheeled renewable and diesel power, with idle GPUs drawing part of their rating
- A researched South Africa profile with wear-and-tear allowances and section 13quin, and every other country selectable
- Overheads that scale with the fleet, so larger halls are not flattered
- A senior loan in dollars or local currency sized on base and downside cover after the GPU loans
- A GPU loan for each refresh, a refresh reserve after debt service and sponsor top-ups
- A vendor-financed black-owned partner, with sponsor and partner returns
- Recoupment on GPUs sold, straight-line book depreciation by component, write-offs at each refresh and deferred tax
- Blended, cash and levelised cost per GPU-hour, and break-even prices for the project, equity and lenders
- Revenue under contract and first-term contracts over the fleet's cost, against published benchmarks
- Value by fleet size and by price decline, currency sensitivity, three tornadoes and a correlated Monte Carlo
Build the case
Inputs and workspaces
- CasesLoad the base, no-contract, anchor customer, fast price decline, five-year generation, leased hall, grid-only, grid outage, rand loan, larger hall or high-return case
- Data hall and fleetCountry, timeline, hall IT load, PUE, GPUs, their power, refresh cycle and resale, overheads and the local currency
- Prices, contracts and powerContract and on-demand prices, price decline, contract share and term, utilisation, services, colocation tenants and power
- Capital and operating costsHall cost per MW, grid connection, leased hall fit-out and rent, GPU cost, contingency, VAT, support, software, upkeep and working capital
- StaffPositions, headcount and monthly cost in local currency
- FinancingLoan currency and sizing on base and downside cover, gearing, rates, grace, tenor, GPU loans and the refresh reserve, working-capital facility, grant and the black-owned partner
- TaxCorporate tax, wear-and-tear lives, losses, holidays and book depreciation
- Valuation and riskCost of capital, terminal value, the GPU-hour price deck and the correlated Monte Carlo of nine risks
- Due diligenceAnchor contract, GPU supply, export control, power, renewable supply, site, build contract, data protection, connectivity and certification
Review the result
Outputs and analysis
- Project NPVUSD, at WACC
- Project IRRUnlevered, after tax
- Equity IRRAfter debt service
- Sponsor IRRAfter funding the partner's shares
- Multiple on invested capitalDistributions over equity
- WACCDiscount rate
- Project NPV in local currencyAt the first-year exchange rate
- Project NPV with a terminal valueUSD, growing perpetuity
- 36 additional metrics in the workspace
- Financial statementsDetailed schedules
- Lender view, fleet, funding & valuationDetailed schedules
- Risk & analyticsDetailed schedules
Designed for review
Who this model is for
- Infrastructure sponsors
- Operating and engineering teams
- Financial advisers
- Investors and lenders
Governed evidence
The review trail stays with the result.
Each completed calculation preserves the model version, saved inputs, reporting-currency snapshot, immutable run, and result fingerprint used for its reports.
- Version-controlled calculation logic
- Saved assumptions and scenarios
- Immutable calculation runs
- Reporting context preserved in exports
Ready to explore the case?